realisations
Rehabilitation of the spillway of a hydroelectric generating station
This project involves the complete rehabilitation of the spillway of a hydroelectric generating station. It includes the complete replacement of the spillway deck, creating temporary access for cranes and machinery, and maintaining the spillway during construction.
Our experienced teams ensure the safety and efficiency of every project stage. Lifting procedures, temporary structures, access and formwork plans are put in place to ensure the fluidity and safety of the work.
We are committed to delivering a quality result in accordance with the highest industry standards to ensure the normal operation of the hydroelectric power plant and contribute to the sustainability of this energy infrastructure.
Jacques Cartier Bridge Rehabilitation
This project to rehabilitate the Jacques Cartier Bridge includes several crucial steps to ensure it’s sustainability. An overall study of the structure’s behaviour is conducted, followed by a capacity assessment to determine reinforcement needs.
The reinforcement design and replacement of steel chords are then carried out, with accurate modelling to ensure the structure’s integrity. The design of temporary structures that respect the existing structure’s ultimate capacity limits is also considered to facilitate the work.
Temporary access is set up to ensure security and compliance with standards. Strict work procedures and quality controls are applied at every stage of the construction site.
Our team also provides on-site technical support to ensure efficient operations and compliance with safety standards. Our commitment is to deliver a quality project, guaranteeing the safety and durability of the Jacques Cartier Bridge for years to come.
Maintenance and emergency services at the Ile-Aux-Tourtes bridge
This project to rehabilitate the Île aux Tourtes bridge includes several crucial steps to ensure sustainability. Our technical team focuses on assisting and executing the work to strengthen the structure efficiently and sustainably.
We use techniques such as post-tensioning and emergency reinforcements to strengthen the bridge and CFRP reinforcements to increase its strength. Temporary accesses are carefully planned to ensure the safety of workers and facilitate operations.
Our commitment to the highest safety and quality standards is reflected in every project step. Our goal is to guarantee the safety and durability of the Ile aux Tourtes bridge through reliable and professional assistance and work execution solutions.